📋 Tender Overview
Scope of Work:
Camden 70 kV reinforcement project.
Description:
This project was submitted by PG&E to address 70 kV line overloads and low voltages at Camden substation that is radially served from Camden-Kingsburg 70 kV line. Operations has observed low voltages at Camden substation and over 90% loading on Camden-Kingsburg 70 kV line during peak conditions due to the local load growth. The recent PG&E distribution load forecast indicates additional loads will need to be transferred from nearby overloaded distribution feeders to the Camden substation. As a result of the increased demand, low voltages were observed at Camden substation in all near-term and long-term summer peak scenarios. In addition, thermal overloads were observed on the Camden-Kingsburg 70 kV line under normal system conditions. This mitigates the NERC TPL-001-5 Category P0 violations.
The project scope includes:
• Install 30 MVAR voltage support at Camden substation;
• Reconductoring of the Camden-Kingsburg 70 kV line to achieve minimum required rating
of 800 Amps under summer normal conditions; and
• Upgrading limiting component(s) as necessary to achieve full conductor rating.
In addition to mitigating the low voltage and normal overload issues mentioned above, this project will also increase load-serving capability, improve customer reliability, and reduce losses. This project has a cost estimate of $50M - $100M and expected in-service date of May 2030 or earlier.