π Tender Overview
The devastating earthquake in 2019 revealed that Albania has a weak policy and institutional framework and low public awareness on building damage assessment. The Swiss project will support Albania in strengthening its disaster risk management institutions at national and municipal level to provide sustainable and effective building damage assessment services, leading to safer living conditions and a more disaster resilient business environment.
Country/region Topic Period Budget
Albania
Climate change and environment
Disaster risk reduction DRR
01.04.2024 - 31.12.2027
CHF 1β365β000
The project in brief
Background Albania faces significant disaster risks. On 26 November 2019, a strong earthquake struck the country. Its impact was devastating, resulting in 1β700 collapsed buildings and 3β600 seriously damaged buildings. Following the disaster, it became apparent that the country lacks the technical expertise to implement building damage assessment effectively.
Objectives Albaniaβs disaster risk management institutions, equipped with technical capacities and contemporary knowledge, provide sustainable and effective building damage assessment services after earthquake, leading to safer living conditions and a more resilient business environment.
Target groups The direct beneficiaries are:
National Construction Institute, National Civil Protection Agency and municipal disaster management units which are part of disaster risk management system.
Municipal civil engineers who are responsible for conducting building damage assessment at local level.
The end beneficiaries are: Citizens and civil society, who are affected by earthquakes, including vulnerable and socially excluded groups, which are often disproportionately affected by natural hazards.
Medium-term outcomes
Policy and legal framework for postdisaster building damage assessment is improved and aligned with international standards (outcome at institutional level).
National Construction Institute and municipalities possess sufficient institutional and technical capacities to conduct building damage assessment with increased transparency towards the population (outcome at institutional level).
Public awareness on seismic risks, earthquake safety, post-disaster procedures and standards is enhanced (outcome at population level).
Results Expected results: 1.1. Government of Albania approves the package of improved legal procedures on building damage assessment. 2.1. National Construction Institute establishes a certified training programme on post-disaster building damage assessment. 2.2. National Construction Institute disseminates the knowledge on building damage assessment to the municipal level. 3.1. National Civil Protection Agency conducts effective public raising awareness campaigns. 3.2. Municipal civil protection units implement public awareness campaigns.
Results from previous phases: Swiss Humanitraian Aid conducted three follow-up missions, which reached tw