📋 Tender Overview
Description :Bridge 44 is located on Road 133 between St. Marys Boundary and Line 14 between Road Sections 161 and 52.1. It’s structure type is rigid frame with vertical legs and was built in 1955 at a cost of $34,022. In 2009, the bridge deck was waterproofed and paved at a cost of $38,384 and a guide rail added at a cost of $25,000. The Bridge Condition Index (BCI) was 50 in 2019. In 2021 the Bridge Inspection Report identified work on this culvert as a priority in the 6 to 10-year time frame. The work required includes new curb, parapet walls, patch repair deck, and allowance for waterproofing and paving.