Scope :
The 210MW hydro project, Boroma is expected to get commissioned by 2027. It is being developed by Hydroelectrica de Boroma. Hydroelectrica de Boroma is the owner of the project.
Description
The project is being developed and currently owned by Hydroelectrica de Boroma.
The hydro reservoir capacity is planned to be 400 million cubic meter.
The hydro power project consists of 5 turbines, each with 52.5MW nameplate capacity.
The project has 5 electric generators that will be installed at the project site.