📋 Tender Overview
scopeThe City of Barrie Multi-Modal Active Transportation Master Plan MMATMP identified Bayview Drive as key transportation corridor and recommended several transportation improvements to accommodate growth in Barrie to 2031.The City of Barrie Infrastructure Department has completed the 100 Detailed Design for this project. Property Acquisition is expected to occur in 2021 and 2022 with utility relocations expected in 2023. Construction is expected to start in 2024.Two 2 3.5 lanes one each northbound and southboundContinuous 4.2m two-way left turn lane1.5m bicycle lanes on both sides of the roadway1.8m sidewalk on the West side of the roadway andReplacement and improvement to local water and sanitary sewer services.