📋 Tender Overview
Project No. : 101010
Description : Extend a delivery main West along Baseline Road from the Arizona Eastern Water Booster Facility. This 16 inch distribution main project will disconnect all current connection to the existing 12 inch transmission main that is in Baseline Road. This will allow the existing main to operate as a true transmission main and the new 16 can function as a true distribution main. Connecting this main to the main in Turner Road will allow for a looped water system to the industrial property on the West and East side of SR 85.