📋 Tender Overview
Description:Relocation of BART administrative headquarters with the Zone 1 patrol to an existing office building with tenant
improvements. The five-story building and adjacent parking lot, formerly used for commercial office space, occupy 1.36
acres on two parcels. The building consists of 86,875 square feet of office space and a subterranean parking garage
consisting of approximately 75 parking spaces. Building access is from Broadway, and the site is directly adjacent to 19th
Street BART Station entrance at Broadway and 20th Street. The project includes tenant improvements for all five-stories to
include features unique to police such as holding cells, armory, evidence room, etc. Improvements to the plumbing,
electrical, HVAC, and fire protection systems may be needed as part of the tenant improvement. The project may also
include structurally retrofitting the existing building, upgrading the existing perimeter fencing, security gate, and improving
the existing parking lot. One floor, or portion thereof, of the building may be utilized by BART staff other than BART Police.
The new BART Police Headquarters will be designed and built under a progressive design-build method, with an
anticipated completion date of August 2026.