STATUS
Approved
MEMBER
India
SECTOR
Transport
E&S CATEGORY
Category A
PROJECT NUMBER
000038
FINANCING
APPROVED FUNDING
USD335 million
FINANCING TYPE
Sovereign
TIMELINE
CONCEPT REVIEW
July 3, 2017
APPRAISAL REVIEW/FINAL REVIEW
September 15, 2017
FINANCING APPROVAL
December 8, 2017
LATEST FIELD VISIT
February 2024
LOAN CLOSING/LAST DISBURSEMENT
December 31, 2021
OBJECTIVE
The objective is to provide efficient and high-capacity north-south connectivity through the center of Bangalore by expanding the cityβs metro system.
DESCRIPTION
The Reach 6 to be supported by the Project runs from Gottigere to Nagavara in Bangalore and the length of the proposed corridor is approximately 22 km, with 6 elevated stations and 12 underground stations. The Project consists of four components.
(i) Construction of Elevated Viaduct and Stations: The component consists of approximately 7.5 km of elevated metro section and 6 elevated stations.
(ii) Construction of Underground Section Tunnel and Stations: The component consists of approximately 14.5 km of underground metro section and 12 underground stations.
(iii) Depot: The component consists of a maintenance depot for the Reach 6 at Kothanur.
(iv) Tunnel Ventilation System and Environment Control System.
ENVIRONMENTAL AND SOCIAL INFORMATION
The Bank has decided to use the EIBβs Statement of Environmental Principles and Standards 2009 (Statement) since (i) it is consistent with the Bankβs Articles of Agreement and materially consistent with the provisions of the Bankβs Environmental and Social Policy and relevant Environmental and Social Standards; and (ii) the monitoring procedures that EIB has in place to ascertain compliance with its Statement are appropriate for the Project. The Bank has placed the Project in Category A. The EIA notification (2006) of the Ministry of Environment and Forest, GoI exempts metro rails from applying for environmental clearance. However, the BMRCL has voluntarily carried out an Environmental Impact Assessment (EIA) in line with EIB standards. The Project will require the acquisition of about 26 ha of land and will include both permanent and temporary land acquisitions and involuntary resettlement of some residential households and businesses. Approximately 800 households are expected to be affected. An Environmental and Social Management Framework (ESMP) has been prepared based on the findings of the EIA, to mitigate the environmental and social impacts due to the Project.
A Resettlement Policy Framework (RPF) has been prepared to address the involuntary resettlement under the Project. The RPF has been subject to consultation with Project Affected Persons and disclosed, in English and local language, on the following BMRCL website: http://english.bmrc.co.in/FileUploads/e12b9f_CareerFiles.pdf.
Public Consultations for the Project are being conducted and will continue throughout the construction phase. Resettlement Action Plans (RAP), con