Bandeira Lithium Minas Tender

πŸ›οΈ LITHIUM IONIC
πŸ“„ Tender ID: 506159775 πŸ“… Published: 16 Jul 2024

πŸ“‹ Tender Overview

The Bandeira lithium project, situated in Minas Gerais, Brazil, is currently under development as an underground mine.

It is being developed by Lithium Ionic, a mining company based in Canada.

The project’s preliminary economic assessment (PEA) was completed in October 2023, and the feasibility study in May 2024.

The Bandeira lithium project is estimated to have a life of mine (LOM) of 14 years with an initial development capital of approximately $266m. The mine is expected to produce 178,000 tonnes per annum (tpa) of spodumene concentrate.

The Bandeira project will feature dual underground mining operations that will optimise the extraction of its deposits.

The primary ore bodies, which account for approximately 83% of the deposit, will be extracted using a bottom-up sublevel stoping method. Concurrently, the secondary ore body in the south–east, comprising roughly 0.98mt will be mined utilising the room-and-pillar method.

The processing plant is estimated to handle a nominal capacity of 1.3mtpa with an overall Li2O recovery projected to reach 68.9%.

The run–of–mine (ROM) ore will undergo crushing in a primary jaw crusher followed by a secondary cone crusher.

The crushed material will be sorted and screened to remove dilution materials, including schist, and non-lithium-bearing minerals such as feldspar and muscovite. The screen undersize at -0.85mm will be fed through hydrocyclones, which in turn feed a belt filter. The resulting fines product will be stockpiled.

The coarse and mid fractions from the screens will be transferred to the coarse dense media separation (DMS) circuit. The screened ore will be fed through dense medium cyclones and the resultant product will be passed through horizontal dewatering screens to produce a final SC5.5 lithium oxide concentrate. Iron monosilicide (FeSi) will also be recovered through the dewatering screens.

A pivotal infrastructure agreement was secured with Cemig Distribuicao (Cemig) in October 2023, for the construction of a grid power supply infrastructure for the project. The infrastructure includes 3km of new transmission lines from Cemig’s existing power grid to a new substation near the mine. The electrical infrastructure construction is scheduled for completion by the fourth quarter of 2025.

πŸ” Key Information

πŸ“„
Tender Reference No.
506159775
πŸ“…
Publication Date
16 Jul 2024
πŸ’°
Estimated Value
N/A
🌐
Sector
Services
πŸ“…
Deadline
31 Dec 2034
πŸ“
Notice Type
Projects
πŸ“
Location
Brazil
πŸ“‘
Contract Duration
10 Years 5 Months 15 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
2981
days remaining Β· 31 Dec 2034
πŸ”” Set Alert

🧭 Quick Facts

Authority LITHIUM IONIC
Country Brazil
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…