📋 Tender Overview
Scope of Work:
Construction of Baltica 1 offshore wind project.
Description:
The project, located about 80 km (50 miles) from the Baltic coast, will have a capacity of about 900 MW and is expected to go online after 2030. After starting a two-year wind measurement campaign for Baltica 1 in May, the company has now tasked a consortium of the Gdynia Maritime University and MEWO SA with conducting the environmental surveys. The consortium will also prepare an environmental report and will be responsible for securing an environmental permit. The next steps will include obtaining a building permit. Baltica 1 already has a location permit and a connection agreement.
Environmental Survey:
1) Gdynia Maritime University
81-87 Morska St.
81-225 Gdynia
Poland
Tel: +48 58 55 86 437
https://umg.edu.pl/
2) MEWO SA
ul. Starogardzka 16
83-010 Straszyn
POLAND
Tel: +48 502 058 294
https://www.mewo.eu/