Renewable Energy Consultancy Engineering Infrastructure and construction

Bac Pumped Storage Tender

πŸ›οΈ VIETNAM ELECTRICITY
πŸ“„ Tender ID: 465715892 πŸ“… Published: 20 Sep 2021

πŸ“‹ Tender Overview

Scope The Bac Ai power project is a 1.2GW pumped storage hydroelectric power plant under construction in the Ninh Thuan province of Vietnam.The project is being developed in two phases by state-owned company Vietnam Electricity EVN with an estimated investment of 695.2m 909.73m.Civil construction works on the project were commenced in January 2020 while the facility is expected to be completed by 2028.Location and site detailsThe Bac Ai pumped storage hydropower project is located in the Phuoc Hoa and Phuoc Tan communes of Bac Ai district Ninh Thuan province in Vietnam. The project site lies approximately 65km west-northwest of Ninh Thuan provinces capital city Phan RangThp Chm.Bac Ai power project development detailsThe Bac Ai power project is one of the power generation projects approved by the government in March 2016 under the national electricity development plan. It is the nations first pumped storage hydropower plant that will help in stabilising the national power system and provide power to meet the peak load demand.The first phase of the project involves the development of discharge gate cluster to facilitate water storage in the lower reservoir. It includes the construction of discharge channels pressure tanks and supply and installation of hydro-mechanical and auxiliary systems.The second phase will focus on the main construction works of the power plant.Reservoir and dam detailsThe Bac Ai pumped storage power plant will feature an upper reservoir artificial lake with a dam height of 72m to be constructed on top of the Da Den mountain. The upper reservoir will be designed with an effective volume of nine million cubic metres Mcm and normal rising water level of 603m.The lower reservoir with a dam height of 38.4m will be created utilising the water from the Song Cai reservoir sourced through the Tan My irrigation system developed by the Ministry of Agriculture and Rural Development. It will be designed with an effective volume of 200Mcm and a normal water level at 193m. The available volume for the lower reservoir will be approximately 10Mcm.The water from the lower reservoir will be pumped to the upper reservoir through two discharge tunnels. Each discharge tunnel will be 2700m long and have a diameter ranging between 5.5m and 7.5m.Bac Ai pumped storage hydropower project make-upThe Bac Ai pumped storage hydropower project will be equipped with four power units of 300MW capacity each. Each unit will consist of reversible pump turbines and reversible motor generators placed in an underground powerhouse near the lower reservoir.The power plant will be designed to operate at a water head of 403m with a maximum discharge capacity of 248m3s.Contractors involvedThe consortium of Construction Joint Stock Company 47 and Narime-Lilama 10 is the construction contractor for the outlet cluster work of discharge gates under phase one.Power Constructi

πŸ” Key Information

πŸ“„
Tender Reference No.
465715892
πŸ“…
Publication Date
20 Sep 2021
πŸ’°
Estimated Value
USD 909730000
🌐
Sector
Renewable Energy
πŸ“…
Deadline
31 Dec 2028
πŸ“
Notice Type
Projects
πŸ“
Location
Viet nam
πŸ“‘
Contract Duration
7 Years 3 Months 11 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
790
days remaining Β· 31 Dec 2028
πŸ”” Set Alert

🧭 Quick Facts

Authority VIETNAM ELECTRICITY
Country Viet nam
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…