π Tender Overview
Scope :
Bac Ai PSP is a 1,200MW hydro power project. It is planned in Ninh Thuan, Vietnam. It will be developed in a single phase. The project construction is likely to commence in 2020 and is expected to enter into commercial operation in 2029.
Pipeline Capacity (MW) 1200
Project Status Under Construction
Project Location Ninh Thuan, Vietnam
Project Developer Vietnam Electricity
Description
The project is being developed and currently owned by Vietnam Electricity.
Bac Ai PSP is a pumped storage project. The project is expected to generate 1,759 GWh of electricity.
The hydro power project consists of 4 turbines, each with 300MW nameplate capacity.
The project has 4 electric generators that will be installed at the project site.
Development status
The project construction is expected to commence from 2020. Subsequent to that it will enter into commercial operation by 2029.