📋 Tender Overview
Avenida Encinas from Palomar Airport Rd. to Carlsbad Blvd (1.7 miles) - in
Carlsbad, the project will construct a portion of the Coastal Rail Trail and connect
to the existing Coastal Rail Trail along Avenida Encinas. Proposed improvements
include expansion of the existing bicycle facilities to buffered bike lanes
throughout the corridor. New sidewalks and pedestrian ramps where there are
missing gaps. Enhanced intersection treatments for pedestrian and bicyclists.
Pedestrian access improvements to the Poinsettia COASTER station. First phase
of the project, which is along Avenida Encinas from Poinsettia COASTER station
to Carlsbad Blvd, will not include road widening, It includes striping modification
to enhance bicycle facilities, pedestrian ramps, new sidewalks where there are
missing gaps, enhanced intersection treatments for improved bicycle and
pedestrian safety, and traffic calming with a road diet at select locations along the
corridor. Second phase of the project, which is along Avenida Encinas from
Palomar Airport Rd and the Poinsettia COASTER station, may include widening to
accommodate multi-modal transportation and traffic calming. The project will not
add additional vehicle travel lane