Infrastructure and construction Airports Aviation

Auckland Airport Massive Tender

🏛️ Auckland International Airport Limited
📄 Tender ID: 444528513 📅 Published: 24 Jul 2021

📋 Tender Overview

ScopeAuckland Airport will expand by more than 250000 square metres as part of a huge new infrastructure build. The new taxiways will eventually link the planned second runway to the current one. Huge passenger planes with wingspans of between 65 and 80 metres will be able to use the new airfield.Earthworks on the new field will begin in mid-2019 and are expected to be completed by late 2021. The development is one of eight major projects for the airport which includes a second runway new cargo facility new international arrivals area rejuvenated domestic terminal and a new domestic jet terminal. As part of the contract the company will be responsible for the construction of an additional taxiway as well as extending an existing taxiway and six remote stands with in-ground jet fuel reticulation. Work will be performed under a major expansion project at the airport over the next two years. In addition the company will construct a 3200m stormwater drainage system runoff and treatment lagoon and a 2200m in-ground jet fuel network. Works will also include 900000m of earthworks laying 130000m of aggregate base course and 168000m of concrete pavement. The construction company expects to complete the project by October 2021. The Auckland Airport expansion and redevelopment will deliver a new second runway as well as combine the currently separated international and domestic terminals. The infrastructure programme is based on Auckland Airports 30-year masterplan which was released in 2014. According to the masterplan the expansion will be undertaken in four key phases. In 2017 Auckland Airport announced NZ1.8 billion A1.68 billion will be invested over 2018-2022 on projects across various phases to accommodate growing passenger and flight demand. Key projects forming the phase 1 infrastructure programme between 2018-2022 include - construction of a new domestic jet terminal connected to the existing international terminal NZ401.5 million - expansion of the international check-in public dwelling and border processing facilities NZ292.7 million - taxiway stands and aprons NZ376.3 million - pier building and connections NZ153.1 million and - roads and transport facilities NZ131.3 million. Phase 2 of the plan up to 2030 includes - a new 2.15 kilometre long northern runway operational by 2028 NZ202 million and - the extension of the terminal forecourt which is expected to be completed by 2030. A consortium comprising Mott MacDonald Holmes Consulting Architectus and Grimshaw was selected in May 2017 to design and develop a combined domestic and international terminal which covers building works over the next 10 years. This comprises the new integrated domestic terminal border processing expansion and transport and car parking facilities. In December 2019 works began on laying a new fuel pipeline below the airfield. This will support airfield works and any future development works u

🔍 Key Information

📄
Tender Reference No.
444528513
📅
Publication Date
24 Jul 2021
💰
Estimated Value
USD 1410000000
🌐
Sector
Infrastructure and construction
📅
Deadline
31 Dec 2044
📝
Notice Type
Projects
📍
Location
New zealand
📑
Contract Duration
23 Years 5 Months 7 Days

📁 Documents & Downloads

View All Documents →
# Document Name Type Action
1
444528513.odt
ODT
2
B444528513.pdf
PDF

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
6618
days remaining · 31 Dec 2044
🔔 Set Alert

🧭 Quick Facts

Authority Auckland International Airport Limited
Country New zealand
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…