Scope of Work:
Atlantic High Voltage Mitigation Project.
Description:
The Atlantic 230/60 kV transformer is the main source to serve the City of Rocklin in Placer County. There are four 60 kV substations (Taylor Road, Rocklin, Del Mar and Sierra Pine) in
this load pocket which are served by the Del Mar – Atlantic #1 and #2 60 kV lines. The existing 230/60 kV transformer is composed of three single-phase banks without regulator and there was a spare single-phase transformer bank available for serving load during maintenance and potential transformer failure. In the 2021-2022 Transmission Plan, the ISO recommended
adding a voltage regulator at the substation to control the voltage on the 60 kV system because of the observation of high voltage at the Atlantic 60 kV pocket in real-time and also in 2026
Spring Off-peak case.
To address these issues, the ISO recommended approval of the Atlantic High Voltage Mitigation (Re-Scope), which includes the following:
• Install a 200 MVA 3-phase 230/60 kV transformer with LTC; and
• Associated bus work at Atlantic substation to install the new transformer.
The total estimated cost of this project is $20M - $40M. The expected in-service date of this project is May 2029.