Astellas Pharma, a pharmaceutical company based in Japan, will establish a new manufacturing facility in Tralee in County Kerry, Ireland, to expand the ability to produce aseptic drug products and bolster stable production for worldwide distribution, while expediting the development and launch of innovative antibody drugs and other novel products.

The company planned to submit a planning application for the facility in September 2023, followed by Kerry County Council’s approval of a ten-year planning permission to build the facility in December 2023.

Being developed with an estimated investment of €330m ($354m), the project is expected to generate 600 jobs during the construction phase and 100 highly specialised jobs after completion.

The groundbreaking ceremony for the facility took place in March 2024, with operations anticipated to commence by 2028.
Location

The facility will be situated within the Industrial Development Authority’s (IDA) greenfield site at Kerry Technology Park, Dromtacker, in the town of Tralee, County Kerry.

Kerry Technology Park spans 45.7 hectares of parkland within walking distance of Tralee town centre. It is adjacent to the Munster Technology University’s new campus.

IDA Ireland is an official agency responsible for attracting and retaining inward foreign direct investment into Ireland.
Astellas Pharma’s new manufacturing facility details

The state-of-the-art manufacturing facility will be built as a three-story structure, covering a total floor area of 17,000m² (182,986ft²). The building footprint will be 7,300m² (78,576ft²) within a total site area of 44.7 acres.

The facility will specialise in the production of aseptic drug products and pharmaceutical products, including antibody drugs. It will focus on the development of transplant, kidney, bladder and cancer drugs.
Sustainability features

The facility’s design will prioritise sustainability, serving as a testament to Ireland’s appeal for investment on a regional scale. It will align with Astellas’ ambitious sustainability objectives and values, integrating the most effective national and international approaches to energy efficiency and environmental design.

The project aims to halve water usage, reduce operational energy intensity by more than one-third and achieve zero waste to landfill, in comparison with the LEED® [Leadership in Energy and Environmental Design] baseline. The measures, together with onsite renewable technologies such as solar photovoltaic (PV) panels and biomass boilers, underscore Astellas’ commitment to climate change mitigation.
Contractors involved

John Sisk & Son, a construction and engineering company based in Ireland, has been appointed as the construction manager for the facility. The company plans to collaborate with local stakeholders and supply chain partners to construct a sustainable building.

🔍 Key Information

📄
Tender Reference No.
504485208
📅
Publication Date
03 Jun 2024
💰
Estimated Value
USD 354000000
🌐
Sector
Pharmaceuticals
📅
Deadline
31 Dec 2028
📝
Notice Type
Projects
📍
Location
Ireland
📑
Contract Duration
4 Years 6 Months 28 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
790
days remaining · 31 Dec 2028
🔔 Set Alert

🧭 Quick Facts

Authority ASTELLAS PHARMA
Country Ireland
State / UT N/A
Tender Type Project Information
Currency USD
Similar Tenders
Loading similar tenders…