π Tender Overview
Scope :
construction work on the 64km Ashaiman roundabout-Akosombo junction road project after a year's hiatus. Germanyβs Inzag was awarded a 30-month engineering, procurement and construction (EPC) contract for the project in September 2020 and commenced work on site in September 2022. However, the project stalled in July 2023 due to the government's debt exchange programme with the IMF.
The project involves the design and construction of a dual carriageway from Ashaiman roundabout in Tema to Akosombo junction south of the Adomi bridge crossing the Volta River and includes two flyovers and interchanges, 11 pedestrian footbridges, three river bridges, drainage structures and walkways.