Scope : NW Arterial Detention Basin Improvements
PROJECT DESCRIPTION/JUSTIFICATION : This project provides for the installation of an energy dissipation, let-down structure where stormwater flows into the NW Arterial Detention Basin from the west. Currently, stormwater from the west flows down into the detention basin over a rip-rap (rock) flume. On multiple occasions over the past few years, the stormwater flows have washed away the rip-rap and caused erosion and damage to the detention basin and the repair costs have become increasingly excessive. Construction of the energy dissipation, let-down structure will eliminate the recurring erosion and maintenance issues. The project was previously budgeted. However, the cost of the recommended improvements exceeded the established budget.