📋 Tender Overview
Project Description : This project consists of the construction of an aircraft control tower to coordinate arriving and departing traffic. Operations at the airport are expected to grow in the furture years requiring the need for services to enhance the safe arrival and departure of aircraft operating at the many different speeds. The benefit cost of an Air Traffic Control Tower is currently being reviewed as part of the Phase 2 Master Plan Update.
Activity #943.32472, 943.32172
Estimated Schedule :
Design and Right of Way Acquisition 2026
Construction 2027