The Agura Independent Power Plant is 780MW gas fired power project. It is planned in Lagos, Nigeria. The project is currently in permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2028 and is expected to enter into commercial operation in 2030.
Description
The project is being developed by Chevron Nigeria. Nigerian National Petroleum and Chevron are currently owning the project having ownership stake of 60% and 40% respectively.
It is a combined cycle gas turbine (ccgt) power plant. The fuel will be procured from NGC Escravos Lagos Pipeline System.
The project cost is expected to be around $750m.
Agura Independent Power Plant (Agura Independent Power Plant Phase II) consists of 1 gas turbine with 165MW nameplate capacity.
The project construction is expected to commence from 2028. Subsequent to that it will enter into commercial operation by 2030.
Contractors Involved : Agura Independent Power Plant (Agura Independent Power Plant Phase I) will be equipped with Siemens SGT5-2000E gas turbines. The phase consists of 2 gas turbines with 165MW nameplate capacity.
🔍 Key Information
📄
Tender Reference No.
475942854
📅
Publication Date
25 Jul 2022
💰
Estimated Value
USD 750000000
🌐
Sector
Non-Renewable Energy
📅
Deadline
31 Dec 2028
📝
Notice Type
Projects
📍
Location
Nigeria
📑
Contract Duration
6 Years 5 Months 6 Days
📁