📋 Tender Overview
The event took place on the grounds of the former Sarandí Grande landfill and was attended by Mayor Guillermo López, Secretary General Dr. Marcos Pérez, Director of Sustainable Development Eng. Enzo Viscailuz, Director General of Works Arq. Facundo Urban, Deputy Director of Decentralization Francisco Acerenza, Representative of the IMPAOC company, Martín Ramírez, members of the NGO Boquita and the notary Javier Sastre.
Through a bidding process, the City Council issued a call for construction of a plant for classification and transfer of urban solid waste in the city of Sarandí Grande.
The plant will consist of a building with a surface area of ??300 square metres, as well as 600 square metre manoeuvring areas for the transit of trucks and garbage collectors.
Local people will be working on waste sorting and storage. The plant will be equipped with state-of-the-art machinery, including a sorting belt that will allow the removal and subsequent pressing of recyclable materials, giving this waste a new use and reducing the amount sent to final disposal.
There will also be a container system: three will be used to transport waste from Sarandí Grande to Florida, and another seven will be used on a rotating basis to different locations in the department to ensure the orderly collection of bulky waste, scrap metal, debris and pruning.
The works will take a period of 5 months.