The Port of Long Beach in California has received a new piece of strategic infrastructure with the opening to traffic of the Gerald Desmond replacement bridge by Webuild Group its U.S. subsidiary Lane Construction and joint-venture partners. The 1.47-billion bridge is the first cable-stayed bridge in California at a length of 2700 metres about 8900 feet and the second tallest of its kind in the United States with its two towers rising about 160 metres 515 feet in height.If there was a monument to progress it would be a bridge said Webuild Chief Executive Pietro Salini. We thank the 3000 people along with the suppliers and other contractors who worked with such commitment despite the difficult months of the COVID-19 pandemic in order to complete the project.The bridge whose construction was done without interrupting vehicle and shipping traffic at the port replaces the old Gerald Desmond bridge with greater earthquake resiliency and extra lanes to handle truck traffic carrying 15 of the cargo imported into the country by sea. At 205 feet about 62 metres it has the highest vertical clearance for cargo ships of any cable-stayed bridge in the country. The bridge is also a critical access route for commuters between the Port of Long Beach downtown Long Beach and surrounding communities. Although the Gerald Desmond Bridge was an icon of Long Beach since it was built in 1960 it was no longer able to sustain the heavy traffic. The new bridge will have three lanes in either direction emergency lanes and bicycle and pedestrian paths.In the United States the Group is working to protect the environment reduce traffic pollution and help cities manage sewage water during heavy rainfall and safeguard rivers and lakes. It is also preparing for the construction of a 379-kilometre high-speed railway that will connect Dallas and Houston in 90 minutes. With a total investment of about 20 billion with about 14 billion for civil works the sustainable mobility project will bring an economic boost to Texas and create 17000 direct jobs in six years of construction and more than 20000 indirect jobs. Among projects concerning water there are the Three Rivers Protection Overflow Reduction Tunnel 3RPORT at Fort Wayne Indiana the Dugway Storage Tunnel in Cleveland Ohio and the Anacostia River Tunnel along with the Northeast Boundary Tunnel NEBT in Washington D.C.
🔍 Key Information
📄
Tender Reference No.
457146780
📅
Publication Date
08 Oct 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
United states
📁
Documents & Downloads
No documents found
🏷️ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.