Bridges and Tunnels

United States Basnight Tender

📄 Tender ID: 456408704 📅 Published: 10 Sep 2020

📋 Tender Overview

The N.C. Department of Transportation will be performing surveying and a high-resolution scan of the Marc Basnight Bridge over the next two weeks. The scan is the first since the bridge opened to traffic in February of 2019.During the surveying crews will confirm the elevation and coordinates for numerous points along the bridge. These points will be used during the scanning to construct a 3D model of the bridge. The surveying and scan work will require two short disruptions of traffic on the bridge. Exact dates may change due to weather conditionsSept. 9-10 Daytime lane closures up to 1.5 miles long. The lane closures will alternate directions and be controlled by flag crews.Sept. 15 or 16 One 30-minute closure of the bridge from noon-1230 p.m.The bridge was built to last 100 years and is designed to expand and contract with changing weather conditions. The scan survey will provide engineers with baseline data they need to ensure the long-term health of the bridge.

🔍 Key Information

📄
Tender Reference No.
456408704
📅
Publication Date
10 Sep 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
United states

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 10 Sep 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country United states
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…