📋 Tender Overview
At the Ukraine 30 Presidential Forum Ukravtodor reported on the first results of the National Bridge Reconstruction Program. The program is designed for 2020-2025 and is designed to renew the outdated bridge economy of Ukraine. These are bridges overpasses over the railway and overpasses over the road. Priority is given to 895 bridges in need of urgent repairs and 169 close to emergency.Results of the first year of the programAccording to the head of the Department of Road Development of Ukravtodor Andriy Ivko in 2020 158 bridges were restored within the program. In particular a number of long-term bridges were put into operation the Marshinsky bridge across the Prut in Bukovyna the bridges over the Lukva and Dniester rivers in the Ivano-Frankivsk region and the Bushtynsky bridge in Zakarpattia. Most of them began to be built more than 15 and even 20 years ago.Work has resumed on the largest and most famous long-term construction project in Ukraine - Zaporizhzhya Bridge. In December the driveway on the upper side of the beam bridge from the Baburka district to Khortytsia was launched. Currently the LK-800 floating crane has arrived in Zaporizhia which will assemble the cable-stayed bridge and 3 sections of the cable-stayed bridge are being prepared for transportation and installation. It is planned to complete the project by the end of 2022.Plans for 2021This year it is planned to launch the first driveway with a cable-stayed bridge in Zaporizhia. Construction of the Kremenchug Bridge as well as the Yampil Bridge Crossing over the Dniester River will begin. In total Ukravtodor plans to repair and build 150 bridges.This month a contract was signed with a new contractor on the Ukrainian market - the Turkish company DOU NAAT VE TCARET A.. The contractor will start work on the Kremenchug bridge according to the design-build scheme - first they will design and then build a new bridge. This is an important event for the country and for the large industrial agglomeration of Kremenchuk. The bridge will be cable-stayed - this is a common world practice for buildings with a span of more than 150 m.This is the first program of systematic renewal of the bridge economy of Ukraine in all the years of Independence. By 2025 we will upgrade at least 20 bridges in each region of Ukraine. It is important that the renovation of bridges is aimed at supporting the national manufacturer as much as possible said Oleksandr Kubrakov Chairman of Ukravtodor.More than 80 of artificial structures in Ukraine were built before 1980. Renovation of bridges in critical condition is a matter of national security.For a long time most buildings were not maintained at the proper level. However we have already achieved positive results for 2020 and plan to continue actively working in the future. In addition to the actual renovation of the bridge economy the program provides for its thorough inspection and investment in specialized education says Andriy Ivko.