📋 Tender Overview
There are seven bridge structures on the section of the R-67 road from Nizhyn to Pryluky. All of them some already are undergoing changes in the process of road repairs.The following types of work are carried out- repair of damaged concrete surfaces of girder beams- repair of damaged concrete surfaces of supports- repair of damaged concrete surfaces of sidewalk consoles- repair of concrete surfaces of strengthening of slopes- installation of asphalt concrete pavement- installation of galvanized railingThe total length of the repaired section Nizhyn - Pryluky - 75 kilometers. We plan to complete the work by the end of May 2021. In 2020 - we will close the section from the turning circle with the road H-07 Kyiv - Sumy to Talalaivka of Nizhyn district. In the next - from Talalaivka to Zrub intersection with the highway M-02 Kipti - Glukhiv - Bachivsk.In the process of repair a new reinforced pavement is being arranged bridges are being repaired roadsides are being strengthened the road situation is being arranged new car pavilions are being installed lighting lines and video surveillance are being carried out in the settlements. This is the first time in 50 years that the Nizhyn-Pryluky highway has seen such large-scale repair works.Within the framework of the Program of the President of Ukraine Large Construction in 2020 in the Chernihiv region it is planned to cover the repair of 196 km of roads of state importance.