📋 Tender Overview
Works on restoration of an artificial construction on the highway of state importance H-26 Chuguiv - Milove were carried out within the Program of the President of Ukraine Volodymyr Zelensky Large constructionAccording to the Service of Highways in Kharkiv region the current average repair of the bridge over the river Seversky Donets was started in late February this year. The works lasted until the end of August.Within five months the right and left aisles were repaired namely the bridge was replaced with a monolithic slab waterproofing asphalt pavement in two layers supports and girders were repaired the SAD said. In addition a new railing and barrier fence has been installed on the bridge drainage and pavements have been installed on the sidewalks made of wear-resistant modern material.Also upon completion of the works markings were applied and lighting was installed.The other day the reconstructed bridge was put into operation.Certificate. The bridge across the Seversky Donets River is located on the H-26 highway at the exit from Chuguiv in the direction of the village of Malinovka. It was built in 1989 and was not overhauled until 2021. The length of the artificial structure is 108.94 p.m.