Bridges and Tunnels Infrastructure and construction

Ukraine Next Tranche Tender

📄 Tender ID: 464431374 📅 Published: 05 Aug 2021

📋 Tender Overview

Delivery of mechanisms was carried out by barges on the Black Sea and the Dnieper. In particular service barges support vessels tugboat and crane arrived from Turkey today. This equipment will work directly in the river including concrete mixers and a crane.In the near future we expect the arrival of another batch of mechanisms a vibratory hammer a pile diesel hammer a drilling rig with backwashing.The day before loaders a grader concrete mixers a manipulator a crane with a capacity of 130 tons concrete and drilling rigs were unloaded and put into operation.The bridge is being built by Dou Grubu.The new bridge will be built parallel to the old one. It will be a cable car with two pylons and will have 4 lanes two in each direction. The total length of the buildings will be more than 3 km.On the right bank of the Dnieper the bridge will connect with the H-08 Dnipro-Mariupol highway. A transport interchange will be built in the area of Literary Lane. On the left bank of the bridge will be connected with the current street network of Kremenchuk in particular the beginning of construction will be connected with the street. Great Embankment. At these points the construction of transport interchanges at different levels is envisaged.

🔍 Key Information

📄
Tender Reference No.
464431374
📅
Publication Date
05 Aug 2021
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Ukraine

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 05 Aug 2021
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Ukraine
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…