📋 Tender Overview
As part of the program of the President of Ukraine Large construction in Starosinyavshchyna completed overhaul of the bridge over the river Ikva on the public road of local importance C 231507 Mykolayivka - Starokostiantyniv-Shrubkiv - Ivankivtsi h z Ilyashivka Oleksandrivka on the section km 0 929.The bridge was built in the late 70s of last century. Since then no reconstruction major and current repairs have been carried out. After the repair the length of the building is 12 m the carriageway consists of two lanes of 3 m each.The whole range of works on the repair of the building was completed earlier. There is a road surface on the approaches and on the bridge itself 6 m wide of the carriageway as well as a barrier fence. The shore and intermediate supports were also strengthened with a concrete mixture with the use of reinforcing mesh reinforced concrete crossbars were installed and bridge slabs were replaced with new ones the old ones were used as transitional ones ensuring the operation of safe traffic.Contractor - PJSC Khmelnytsky Construction and Assembly Department 69.Thanks to the repair of cities brought to modern building codes extended the service life increased its carrying capacity provided safe conditions for all road users.