📋 Tender Overview
Works on the artificial structure are performed within the framework of the Presidents Big Construction Program.The bridge with a total length of almost 25 meters which was built in 1969 has not been repaired before. According to the State Enterprise Roads of Kharkiv Region repair work on the man-made structure on the O-211028 Zolochiv-Kozacha Lopan highway km 19 977 within Kozacha Lopana began in April. Currently the main dismantling works are being performed at the facility namely milling of the old layer of asphalt concrete pavement dismantling of slabs of girder structures and existing intermediate supports.Preparatory work has begun on the artificial structure before the installation of bored piles for the installation of supports and work on the restoration of slabs of girder structures - said the State Enterprise Roads of Kharkiv region.Road workers warn that the road is blocked. Traffic is carried out in accordance with the approved scheme of temporary detour of the bridge structure. Drivers are asked to pay attention to the new road signs and strictly follow the instructions.