Roads and Highways

Turkey Have Expanded Tender

📄 Tender ID: 492606590 📅 Published: 10 Aug 2023

📋 Tender Overview

Minister Uralo?lu, until 2003 While there are only 22 kilometers of divided roads, adding another 182 kilometers to 204 Emphasizing that they have increased our province to the kilometer, "With divided roads, our province to Bart?n, We connected it to Bolu and Düzce. Bituminous hot-coated highway across the province We increased its length from 16 kilometers to 221 kilometers. Before you get here The standard of transportation between Ere?li and Devrek, the two large districts of Zonguldak, We examined the Ere?li – Devrek Road, which will be raised. Existent As a matter of fact, we are shortening our 57 km long road by 1.5 km with the project and we aim to reduce the transport time from 65 minutes to 48 minutes. 44.5 km We completed the section as the only road with sathi pavement.

Road in the remaining 11 km We continue the construction work. Construction works continue in Zonguldak One of our most important highway projects is undoubtedly the Western Black Sea Coast. is the way. An important part of the project is Zonguldak-Kilimli-Filyos-Çatala?z? Path project. The existing road, which has an average width of 7 meters, has a total of 34.3 km long, bituminous hot mix coated divided road project has been prepared. With the completion of our project, the settlement and Filyos Port It will be ensured that safer and more comfortable travel can be made between the parties. So; The road will be reduced from the current 45.6 km to 34.3 km, the travel time will be 71 It will go down from minutes to 25 minutes. By route Sinop, Bart?n and Zonguldak The transportation of the provinces to Düzce, Sakarya, Kocaeli and Istanbul will be easier. First In the phase, the 6.5 km section of this project between Zonguldak and Kilimli and put it into service on February 5, 2022. Located on this road line We opened the Prof. Dr. Teoman Dural? Tunnels.

With Zonguldak, which has a heavy industry; On the road connecting the Kilimli, fast with tunnels and connection roads, We have established comfortable and safe transportation. We have shortened the route by 4.5 km, 40 The route traveled per minute was shortened by 35 minutes to 5 minutes we took it down," he said.

🔍 Key Information

📄
Tender Reference No.
492606590
📅
Publication Date
10 Aug 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Turkey

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 10 Aug 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Turkey
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…