📋 Tender Overview
30.06.2025 Tunnel full of perspectives - a step towards year -round trips to Czechp. We will build a railway tunnel on the route from Walbrzych to the Czech Republic. Improving the condition of the facility in Unislaw Slaski, a previously modernized viaduct, bridges renovated in recent years and other works - in a total of about PLN 40 million - on the Boguszow -Gorce - Mieroszow line (state border) will allow carriers to plan convenient, year -round connections with our neighbors. Kolejowa Kolejowa Boguszow -Gorce - Mieroszow kilometers - this is the shortest connection of Walbrzych with the Czech Republic. Since 2018, we have been conducting works on the route that allow for increasingly efficient train journeys. Now its time to renovate the railway tunnel in Unislaw Slaski. The contractor who undertakes works will have the task of dismantling the tracks and the reconstruction of the 260-meter facility. The tunnel will be strengthened, refreshed and adapted to the required technical parameters. The teams will install a new track surface and lighting. The current speed in the facility is 20 km/h. After work, trains will go 100 km/h. Revitalization will start after signing the contract, which is planned for November 2025. We will finance the task from the state budget. The expected delivery time is 18 months from signing the contract. We are currently at the stage of the tender procedure. The tunnel collection is another investment on the route to Mieroszow, which is undertaken for year -round travels. Currently, trains run only in the summer season. In 2019 and 2020, we carried out a renovation of two bridges in Kowalowa. The objects have been drained, cleaned and strengthened. Works worth nearly PLN 13 million were financed from budget funds. Last year we completed the reconstruction of the railway viaduct over the road to Sokolowska. Actions not only improved the parameters of the railway route, but also positively affect road and pedestrian communication. The reconstruction of the viaduct will allow you to widen the road and build a pavement. The height of the facility allows for a safe journey of trucks and emergency services-it was not possible before the investment. For travelers, the Boguszow-Gorce Dzikowiec stop was built, built as part of the bus stop program in 2023 for over PLN 3 million. Lovers of mountain trips he provided convenient and short access to the unique tower in Dzikowiec. From the stop to the observation platform, only 2.5 kilometers are divided. Railwaymen significantly improved the condition of 10 kilometers of tracks on the section: Boguszow -Gorce Dzikowiec - State border - trains accelerated from 30 km/h to 70 km/h. As part of this investment, we also improved the conditions at the Unislaw Slaski stop - we renovated the platform edge and set up a new shelter. The value of the completed task, covering a 10-kilometer section and additional work in Unislaw is about PLN 20 million. We do not forget about rail-road crossings. In 2023, we improved safety at two intersections of track and roads in Mieroszow - at ul. Adama Mickiewicza and ul. Walbrzyska. We are currently replacing travel devices for modern on the next two journeys-in Boguszow-Gorce at ul. Sportowa and in Mieroszow near ul. Lesna. Works at journeys, worth over PLN 2 million, will end this year and are financed from KPO. We do not slow down. Last year, we significantly shortened the travel time from Wroclaw to Miedzylesie and the Border with the Czechs. The effects of these activities allowed carriers to launch calls to Prague in an attractive time. We are currently working on restoring year -round travel by rail to Mieroszow and further - to the Czech Mezimesti. This solution will make it easier for tourists to discover the charms of the region, and will provide residents with convenient rail connections with larger towns regardless of the season.