Water and Sanitation

Transposition Sao Francisco Tender

📄 Tender ID: 525350723 📅 Published: 22 Nov 2025

📋 Tender Overview

Brasilia (DF) - The Sao Francisco River Integration Project (PISF) transformed the water matrix of the Northern Northeast. And so that the population can enjoy the waters of Velho Chico, municipalities, states, companies and communities must follow a process with the Ministry of Integration and Regional Development (MIDR) and state operators.
The National Water Security Secretariat (SNSH) detailed the path to access water from the Sao Francisco River. But first, what are the characteristics of users who have the right to request access and use of water that arrives through the PISF?
A defines the user categories:


Small User: user whose maximum collection flow is stipulated by the State Operator, limited to 2.5 liters per second;


Small Agricultural Communities: PISF user characterized by irrigation and human consumption activities, installed in Rural Productive Villages - VPRs, defined in the environmental licensing;


Isolated Water Supply System (SIAA): user of the PISF characterized by a water supply system for isolated communities located in the Directly Affected Area (ADA) of the project, which comprises a 10 km strip having the canal route as its axis, as provided for in the environmental licensing;


Independent User: PISF user with direct collection from the infrastructures of the North and East Axes, Apodi and Pianco Branches, in accordance with ANA regulations, and who does not qualify as a State Operator, Small User, SIAA or Small Agricultural Communities.


To capture water directly from the PISF infrastructure, the journey of the Small User, SIAA and Agricultural Communities necessarily passes through the state operator, where they must request authorization to use the water and present the basic project containing the type of water use, the required flow and the capture infrastructure projects.
In the next step, the state operator approves the access request and then requests authorization to install the collection structure from MIDR, the federal PISF operator. Once the water supply contract is signed between the user and the state operator, the installation of the collection structure will be scheduled.
The total period between the request and the actual collection of water is estimated between two and six months. The deadline may vary due to project analysis, material acquisition by the user and inspections.


Other News:

🔍 Key Information

📄
Tender Reference No.
525350723
📅
Publication Date
22 Nov 2025
🌐
Sector
Water and Sanitation
📝
Notice Type
News
📍
Location
Brazil

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 23 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Brazil
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…