📋 Tender Overview
Municipality intensifies road improvement works in the 1st stage of the Patibamba urbanization.The Provincial Municipality of Abancay (MPA) continues to execute the project for the integral improvement of tracks and paths in the Patibamba 1st stage, one of the most anticipated works by the residents of this important sector of the city. The work is developed with the objective of guaranteeing a modern, safe and lasting road infrastructure.
During the day today, key actions were developed such as the execution of a rainwater evacuation channel in a stretch of 200 linear meters, a fundamental work to mitigate the effects of heavy rains.
Likewise, 80 % of the land cut has been completed, indispensable step to shape the road platform. At the same time, the structural base is worked on the formation of the structural base, using ballast selected material, which ensures the necessary resistance for vehicular traffic.
The basis for paths has also been preparing, applying granular material that will facilitate adequate compaction and leveling, complying with the technical standards required for urban infrastructure works.
This intervention is part of the project Improvement of the Vehicle and Pedestrian Transitability Service of the tracks and paths in the Patibamba 1st stage, identified with CUI No. 2569885, promoted by Mayor Raul Pena Sanchez. The project includes an investment of more than 4.2 million soles and responds to the need to improve connectivity in this strategic area of Abancay, as well as strengthen urban development in Patibamba.
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Mayor Raul Pena Leader who transforms promises actually