Infrastructure and construction

Transformation Metra Above Tender

📄 Tender ID: 539921925 📅 Published: 06 Nov 2026

📋 Tender Overview

Summary With the demolition of the facade of Metra, the office building directly above The Hague Central Station, the transformation of the former Stichthage is for the first time clearly visible. Metra is being extensively renovated into a sustainable and future-proof office building, while retaining its recognizable architecture. The renovation aims for a Paris Proof office building and a BREEAM Excellent certification, which means it meets high sustainability standards. This gives the existing building a new future in one of the most accessible office locations in The Hague. In the preparatory phase, reuse was central. Through urban mining, ceiling panels, glass interior walls, and sanitary facilities were given a new purpose at locations in the vicinity. Sebastiaan de Wilde, CEO of NS Stations: Sustainable development means for us that we build on what already exists. We make conscious choices in materials and energy and take responsibility for the long term. Metra shows that sustainability does not start with new construction, but with the question of how to improve the existing. Metra facade demolition The Hague Building on a postage stamp The location directly above a station makes the execution particularly special for construction company J.P. van Eesteren. To ensure accessibility for travelers, residents, and businesses as much as possible, the existing facade sections are removed and the new facade is constructed from the inside of the building. This limits the use of a construction crane to situations where it is absolutely necessary. Because there is hardly any storage space available, construction parts must be delivered and assembled at precisely the right moment. The choice of materials takes into account both the existing gravel concrete facade and the desired contemporary appearance. For the new parapet, approximately 1,680 100% biobased facade panels will be used. Thanks to their low weight, these can be transported via the construction lift. The lightweight elements thus simplify logistics on this compact construction site. Marco Peppel, CEO of J.P. van Eesteren: With Metra, we have a special project at hand: it is technically complex, sustainability is central, and it is located above a very busy station location. But at JP, we do love a challenge. And we know the place like the back of our hand, as we just built KJ here for three years. It is especially nice to contribute our expertise to the preservation of a characteristic building like this. We love what we build and now also love The Hague. Significance for the station area The renewal of Metra contributes to the development of the station area and the Central Innovation District (CID). The renovation combines the preservation of a recognizable building with a high-quality working environment in a central location, directly connected to public transport. Henk Harms, Alderman for Urban Development, Municipality of The Hague: Many construction activities are taking place around The Hague Central, including many new offices and homes. Metra fits perfectly into this picture with the many new and modern workplaces that will be here, providing as many residents in the Central Innovation District as possible with work and amenities close to home, also in a special location right above The Hague Central. With the start of the facade work, the transformation of Metra is becoming increasingly visible. In the coming period, the building will gradually take on its renewed appearance. Thus, a future-proof working environment is created above The Hague Central that builds on the existing and contributes to the further development of the station area.

🔍 Key Information

📄
Tender Reference No.
539921925
📅
Publication Date
06 Nov 2026
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
Netherlands

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 06 Nov 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Netherlands
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…