📋 Tender Overview
The curbs, ramps and pavement present a progress of 90%The Provincial Municipality of Piura carries out the construction of tracks and trails in the Los Educadores PAV. It is 80% complete and will directly benefit more than 1,840 families, improving walkability, safety and quality of life in the area.
With an investment of more than 9 million soles, the work already shows visible results in its streets and sidewalks. According to the resident engineer, Angel Alva, the work on sidewalks has already been completed, while the curbs, ramps and pavement are 90% complete, incorporating technological improvements that guarantee greater durability.
The project includes the construction of 21,517.97 square meters of rigid pavement, 11,372.23 square meters of sidewalks and ramps, and 1,727.35 linear meters of submerged sardinel, executed under strict quality standards.
In addition, the work includes an environmental component with the planting of 268 seedlings and the improvement of 6,569.12 square meters of green areas, contributing to recovering the environment and improving the urban landscape.
With this comprehensive intervention, the Provincial Municipality of Piura advances in the modernization of the city, integrating road infrastructure, storm drainage and environmental recovery for the benefit of its neighbors.