1. Background1.1 Tropical Cyclone Gita and Request for Additional FinancingTropical Cyclone Gita TC Gita struck the Kingdom of Tonga on February 12 13 2018 as a Category 4 Tropical Cyclone. It caused extensive damage and loss to property and public infrastructure including schools and health facilities totaling US164.2 million. Recovery needs exceeded the existing resources of the government and consequently the Government of Tonga requested Additional Financing under the World Banks Pacific Resilience resulting in the PREPCER-S1 Tonga Schools project the Project.TC Gita highlighted the vulnerabiliy of school infrastructure within Tonga. School buildings were affected disproportionately with the rapid assessment estimating approximately 75 percent of the 150 schools on the main island of Tongatapu as damaged compared to 25 percent of all residential buildings. Damage and losses to the education sector were estimated in exccess of US10.2 million with many classrooms and Water Sanitation and Hygiene WASH facilities in need of repair retrofitting and reconstruction to higher engineering and more resilient standards. Almost three months after TC Gita struck nearly 1200 students continue to attend classes in tents which in some cases are situated on inundated areas. Many schools operated with inadequate WASH facilities. Urgent reconstruction and repairs are needed to move the students back to a more stable learning environment.1.2 The Additional Financing donors working partnersComponent 2 of the parent project was scaled up to include the rebuilding repairing and retrofitting of schools damaged by Tropical Cyclone Gita. It aims at strengthen the resilience of buildings and related infrastructure particularly for schools and health facilities to better withstand future disaster events. The Additional Financing of US13.81 million increased the preliminary amount of US1.69 to a total of US15.5 to fund the school resilience construction program.The construction was co-funded by the World Bank WB and the Government of Australia. The Project is administered by the Project Management Unit PMU under the Ministry of Meteorology Energy Information Disaster Management Environment Communication and Climate Change MEIDECC. MEIDECC has been working collaboratively with Ministry of Education and Training MoET Ministry of Infrastructure MoI Ministry of Land and Natural Resources and the Ministry of Finance and National Planning for the quality.2. The School Resilience Construction Program2.1 Priority Schools identified and construction contractsThe Project was for the design and construction of 25 schools 16 Government 9 non- Government. 21 in Tongatapu two in Eua which suffered major damage during TC Gita. Two Government Primary Schools GPS in Vavau were also included in the scope of works.The twenty-five priority schools were GPS Navutoka GPS Fasimoeafi GPS Vain Apifoou College Beulah Primary GPS Haamonga GPS Kahoua GPS Feletoa GPS Taoa GPS Ohonua Hfangahau College GPS Hoi GPS Fhefa GPS Matahau Moungaolive College Talafoou Middle School Tpunisiliva GPS Nukualofa Tonga College Tupou High School Beaulah Adventist College GPS Holonga Tonga Police College and Takuilau College GPS Maufanga and Queen Slote College. These schools were grouped into 7 packages based on the urgency of the need for classrooms.Cardo an Australian Company was contracted as the Design and Supervision Firm. Contract Agreements were signed by 10 local construction companies including one for a WASH only. Due to the urgent need for students and teachers to be in a much safer learning environment the contracted completion period was 120 days. However challenges and problems caused delays.2.2 The Constructions2.2.1 Some detailsThe ground breaking for the school resilience construction program was held at GPS Navutoka on October 8th 2019 by the Prime Minister Honourable Phiva Tuionetoa. The construction began at GPS Navutoka on the 14th October 2019 whose new classrooms were the first to be commissioned on Feburary 11th 2020. The constructions of the remaining 24 schools also started and gained momentum thereafter.On the 28th May 2021 the classrooms of the 25th and last school Tonga Police College were commissioned by the Australian High Commissioner to Tonga His Excellency Adrian Morrison. It took 18 months 2 weeks and 6 days 8th Oct 2019 28th May 2021 to complete the school resilience construction program in 25 schools. The duration of the constructions at each school ranges from 4 10 months with an average of 5.8 months.The total number of school buildings constructed were 43 of which 33 were reconstructed and 10 were repairedretrofitted. There are 125 classrooms in total of which 88 with an area of 50 m2 a Mnistry of Education size to accommodate approximately 25 30 students. 37 classrooms were repairedretrofitted with various sizes. The number of classrooms in each building ranges from 2 to 6. Of the 33 reconstructed buildings there are 15 two classroom halls 7 three classroom halls and 2 four classroom halls all are partitioned with wondoors that could be drawn to form halls. 8 of these 33 school buildings have a store room.The buildings are better stronger durable and more resilient which will last for approximately more than 50 years. The rebuilt and repairedretrofitted classrooms are equipped with whiteboards and pinboards mobile fixed. For safety purposes fire alarms fire extinguisher cylinders toughened glass louvres and security screens are installed. The floors are tiled. The defect liability period is one year from the date of the taking-over certificate. Most of the building materials are on warranty ranging from 3 to 10 years such as the roof sheeting 10 years wondoors 3 years and floor tiling 5 years.
π Key Information
π
Tender Reference No.
462827526
π
Publication Date
04 Jun 2021
π
Sector
Education and Training
π
Notice Type
News
π
Location
Tonga
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.