📋 Tender Overview
- Comptroller warned water filtration in asphalt folder, together on tracks, sidewalks and ramps, among other failuresTacna.- The Comptroller General of the Republic - CGR identified deficiencies in the work of improvement of the urban mobility service, located between Jorge Basadre and Calle Mexico avenues, in the young people of La Esperanza, valued in more than S/ 12 million 879 thousand, which was completed three months ago by the Alto District Municipality of the Alliance.
In the Concurrent Control Report No. 10111-2025-CG/GRTA-SCC, carried out from August 11 to 15, 2025, it was detailed that the Control Commission found water leaks in the asphalt folder due to deficiencies in the home reconnection work of the drinking water service.
Likewise, it was breached with the technical specifications of the project by not placing joints stuffed with asphalt mixture in the improved roads, expansion joints in paths and vehicle ramps; which would generate the possible appearance of premature failures such as fissures, cracking or detachments of concrete in these structures.
In the same way, the established parameters for the construction of rest benches and pergolas for pedestrian uses were not met, in addition to the installation of garbage dumps on the roads, the distribution indicated in the plans of the work did not follow. In addition to this, damage was found in supports and vertical signaling panels, paint detachment in gardeners, as well as wear and loss of green areas.
The Comptroller General also warned that the work to date has not been received or liquidated by the Municipality, despite the time elapsed since the works concluded, which would affect the maintenance of the new infrastructure by delaying the programming and execution of the same.
Visit us at:
Tiktok: @Contraloriaperu
Flickr: Flickr.com/fotosContraloriaperu/
Instagram: @Contraloriadelperu
Facebook: Comptroller Peru
X: @Contraloriaperu
YouTube: Comptroliatv
Tacna, September 30, 2025
Communication Management
Press NOTE N deg 825-2025-CG/GCOM