Railways

There New Quality Tender

📄 Tender ID: 519942859 📅 Published: 03 Jul 2025

📋 Tender Overview

On 01.07.2025 there will be a new quality of traveling by rail from Malbork to Elblagarus with works on the railway route from Malbork to Elblag. For works that will result in accelerating trains on the line connecting Pomerania with the province. Warmian-Masurian Voivodeship, a specialized PUN machine will be used. Ultimately, we want passenger trains to be on a renovated section at a speed of up to 160 km/h. The value of the works is PLN 112.5 million net (PLN 137.5 million gross) from PKP Polskie Linie Kolejowe S.A. We have started renovation works on the 28-kilometer section of the railway line No. 204 between Malbork and Elblag, on an important route connecting the province. Pomeranian from the Warmian-Masurian Voivodeship. We will connect the surface of both tracks. There will be new, non -contactless rails and string concrete sleepers, which will translate into reducing noise and better driving comfort. Cleansed and supplemented with a crushed ballast, and the traction network will be adjusted. For work, we will use a machine for streaming PUN surface replacement, enabling quick and automated conducting track works, while removing used elements and arranging new ones. In addition, drivers will pass more efficiently through the tracks thanks to the replacement of the surface at 17 rail and road crossings, including in Fiszew, Olesno and the upper inn. The work is planned in December this year. Their range will not affect the train timetable - replacement bus communication is not planned. The value of works performed by Pomeranian Przedsiebiorstwo Mechaniczno -Taraowe in Gdansk Sp. z o.o. amounts to PLN 112.5 million net (PLN 137.5 million gross) from PLK SA.- in the province. Warmian-Masurian Voivodeship we conduct investments that provide comfortable, faster and, above all, safe travel by rail. Not only the largest, such as completed modernization of Olsztyn Glowny and Elk stations or works on the Elk - Gizycko - Korsze route, but also providing better and better trains in the region. This is also the purpose of working on the route from Malbork to Elblag - said Krzysztof Waldowski, director of the Railway Lines Department in Olsztyn, PKP Polskie Linie Kolejowe S.A. In 2026, after securing financial resources, the second stage of work on this section of line 204 is planned. We anticipate the assembly of active traffic security devices on 5 rail -road crossings (Fiszewo, Dworka road - Hastage - Bastard, Olesno, Droga Gajewiec - Szopy, Szopy, Karczowiska Gorne), and above all the modernization of the traction network, which will allow you to increase the speed of passenger trains to 160 km/h (currently 100-120 km/h), and freight trains up to 120 km/h (currently 80-100 km/h). Thus, travel time between Malbork and Elblag will be shortened by about 5 minutes.

🔍 Key Information

📄
Tender Reference No.
519942859
📅
Publication Date
03 Jul 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Poland

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 03 Jul 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Poland
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…