Bridges and Tunnels

Taiwan Province China Tender

📄 Tender ID: 481228547 📅 Published: 26 Nov 2022

📋 Tender Overview

The Shuidu South Bridge connecting the Douliu Ancient Pit due to the old bridge and insufficient treatment section the Yunlin County Government sought funds from the central government for reconstruction. The county magistrate Zhang Lishan met with the deputy magistrate Xie Shuya this morning 24th Leading the county government team together with Xu Wenhong deputy head of the Dounan Public Works Section of the Fifth Engineering Department of the General Highway Administration Kong Xiangjia secretary of the Wuhe Bureau of the Water Conservancy Administration Lai Mingyuan member of the Yunlin County Council Shen Shengteng head of Gukeng Township and Yuan Zhiqian director-general of the Gukeng Township Farmers Association Shuidu Village Chief Lin Yongjie local representatives residents etc. held a ground-breaking ceremony in the work area.County Mayor Zhang Lishan said that the Shuidu South Bridge is located on the second line of County Road 154. It is an important hub connecting Gukeng Township to various regions. Since it was opened in 1968 except for the exposed piers and many cracks and falling off of the bridge the width is only 8.6 meters. If the number is too large it does not meet the needs of the treatment plan. In the event of heavy rain during the flood season there is a risk of insufficient water passage sections.County Mayor Zhang further explained that the total cost of rebuilding the Shuidu South Bridge on County Road 154 Line B is NT260295803 of which NT186604000 was subsidized by the General Administration of Highways and the Water Conservancy Department of the Ministry of Economic Affairs. Thanks to the central government for considering local financial difficulties to provide assistance but the original county governments local cooperation fund is NT22.904 million. Taking into account the current price another NT50.787803 will be invested. The total length of this project is 650 meters including the reconstruction of the whole bridge of Shuidu South Bridge bridge length 130 meters the widening of the connecting approach roads on both sides and the connection of flood control roads. After planning and discussion the amount of follow-up management and maintenance is considered. Structural durability reconstruction cost and road surface lift height the 4-span pre-stressed I-beam bridge is adopted and the total width of the bridge deck after reconstruction is 18 meters which can improve road safety and increase flood control capacity.County Magistrate Zhang presided over the ground-breaking ceremony for the reconstruction project of Shuidu South Bridge on County Road 154 Line B hoping that the project will be complete and smooth

🔍 Key Information

📄
Tender Reference No.
481228547
📅
Publication Date
26 Nov 2022
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Taiwan, province of china

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 26 Nov 2022
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Taiwan, province of china
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…