📋 Tender Overview
Deputy Prime Minister Tran Hong Ha has just signed Decision No. 922/QD -TTg amending and supplementing a number of articles of the inter -reservoir operation process in the Red River basin issued with June 17, 2019. Hoa Binh Hydroelectricity Decision No. 922/QD-TTg supplemented the regulation on the operation of inter-reservoirs on the Red River basin in the transition period and water accumulation: From September 16 to October 31, it is possible to amend and supplement Article 9 on operation in the late flood period, the transition period, the water accumulation as follows: 1. From August 22 to September 15, based on the trend of hydro -meteorology of the Department of Meteorology and Hydrology, the Minister of Agriculture and Environment determines the gradual accumulation of Son La lake to the 213 m, Hoa Binh lake to 115 m high, Ho Tuyen Quang to the 118 m high process and Thac Ba lake to the 58 M high process. The secretion to lower the water level of the lakes but the maximum is not lower than the value of the water level specified in Table 3. During the process of Hoa Binh, Tuyen Quang and Thac Ba, the waterfall regulates to lower the water level of the lakes to the high process prescribed in Table 3, which appears large floods in the lake or water level at the Hanoi Hydrometeorology Station, which is at risk of overtaking 10.5 m, the Minister of Agriculture and Environment reviews and reduces the decision to reduce floods and decide to reduce floods for the decision to reduce floods. If the flood flow continues to increase, the lakes water level is at risk of overtaking the water level and the water level at the Hanoi Hydrometeorology Station is at risk of exceeding 11.5 m, the Minister of Agriculture and Environment leads and coordinates with the Ministry of Industry and Trade to consider and decide to use a part of flood -proof volume for flood reduction for downstream but must ensure work safety. From September 16 to October 31, the lakes of Son La, Hoa Binh and Tuyen Quang were actively accumulated to the normal level of water level. In the process of accumulating water, in case the Department of Hydrometeorology warns or forecasts of storms, tropical depressions or other weather images that are likely to cause floods, in the next 5 days, there is a risk of directly affecting the reservoir basin, if the lake level is higher than the 115 m higher process for Hoa Binh Lake and 118 m for Tuyen Quang Lake, the Minister of Agriculture and Environment is not lowered by the water level, but the water level is not lowering the water level, but the water level is not lower 115 m for Hoa Binh Lake, 118 m for Tuyen Quang Lake. If the lake water level is lower than 115 m high for Hoa Binh Lake and 118 m for Tuyen Quang lake, the lakes operate to maintain the current lake water level to catch the flood. During the water accumulation, Son La Lake is allowed to use the capacity from the normal rising water level to the largest water level design (217.83 m) to cut floods for the downstream. When the lakes of Hoa Binh, Tuyen Quang and Thac Ba have accumulated normal water levels and the flow to the lake continues to increase, it is allowed to discharge to the downstream equivalent to the flow to the lake. Actions in abnormal situations, emergency situations on natural disasters, Decision No. 922/QD-TTg also amended and supplemented Article 12 about operating in unusual situations, emergency situations on natural disasters: 1. During the operation of the flood season, when the lakes of Son La, Hoa Binh, Thac Ba and Tuyen Quang were fully likely to cut floods and the water level of the Red River at the Hanoi Hydrometeorology Station continued to rise quickly, or there was a risk of serious incidents for the dyke system, or said it was likely to appear larger than the 500 -year flood that appeared once, but smaller than the design flood of La La lake (10,000 years of floods), there were urgent situations, or occurred in urgent situations. Unexpected situations specified in this process threatening dike safety, works and downstream, the Minister of Agriculture and Environment shall report to the Prime Minister, and report to the Head of the National Civil Defense Steering Committee for consideration and decision on the operation of reservoirs, or perform the assigned responsibilities in accordance with the law. In addition to the time of operating the flood season specified in Article 2 of this process, the Minister of Agriculture and Environment decides the operation of the lakes of Son La, Hoa Binh, Ba Thac Ba and Tuyen Quang as prescribed by this process when one of the following abnormal floods appears: a) When lowering the risk of floods and floods from level 2 or higher in accordance with the level of disaster risk level; b) Appearing incidents in the process of operating work safety items; c) The incident occurs or there is a risk of threatening to the safety of dike, irrigation works, infrastructure in the downstream; d) Other situations that threaten the downstream of the downstream area decided by the Head of the National Civil Civil Defense Steering Committee; This amount to cut floods for Ha Du must ensure the safety of the work. 3. During the process of operating the lake as prescribed in Clause 2 of this Article, when lowering, there is a risk of appearingFloods and floods on level 3 are prescribed by the level of disaster risks or the risk of incidents in the process of operating items that threaten the work safety or when there is a complicated disaster development, the risk of serious consequences, occurring on a large scale, the Minister of Agriculture and Environment presides over and coordinates with the ministries and branches to report to the Prime Minister, and report to the National Defense Defendants Currently, the responsibility has been assigned, decentralized and coordinated in responding to emergency condition on natural disasters in accordance with the law on emergenc