The company must replace the roof coverage, reinforce water quality control and carry out cleaning and disinfection actions.The National Superintendency of Sanitation Services (Sunass) imposed a corrective measure on Epsel S. A. for not ensuring the provision of drinking water service in adequate quality conditions in the southern reservoir, located in the district of La Victoria, province of Chiclayo.
The measure was ordered by Resolution No. 042-2026-SUNASS-DF, after an inspection action initiated ex officio following a complaint, in which it was noted that the reservoir (3,000 m3) lacked a dome and had an inoperative cover.
During the inspection, the results of which are contained in the inspection report, the regulator concluded that the providing company, by maintaining the reservoir without an adequate roof, contravenes Article 37 of the Regulation of Quality of the Provision of Sanitation Services, by not guaranteeing the service in the best quality conditions.
Corrective action ordered
In this framework, Sunass ordered Epsel S. A. to comply with replacing the roof coverage of the southern reservoir, in order to avoid affecting the quality of the water stored and distributed by said reservoir; carry out quality control of stored water at least twice a day, in order to identify and mitigate possible risks of external contamination; and carry out the cleaning and disinfection of the reservoir, at least once during the period granted to implement the corrective measure and after the installation of the coverage.
To prove compliance with these provisions, the company must send to Sunass, within a maximum period of ten business days from notification of the resolution, the corresponding documentation and technical records. The regulator will continue to monitor compliance with the ordered measure, with the aim of protecting public health and the rights of users of the sanitation service.
Did you know that...
In 2022, Sunass had already inspected the lack of a roof in the southern reservoir and ordered a corrective measure to Epsel S. A.; However, this was not fulfilled due to the paralysis of the reservoir repair project, whose contract was terminated in August 2023 when the work registered an approximate progress of 28%, which subsequently led to the imposition of a fine equivalent to 0.60 UIT for non-compliance with this corrective measure.