📋 Tender Overview
Summary NS can make more trains available on busy commuter days and simultaneously accelerate the removal of old trains from the fleet. This is the outcome of the trial smart maintenance planning at several NS workshops. The core of the trial is to stop performing small repairs on busy commuter days, Tuesday and Thursday. These non-essential repairs will then be scheduled on quieter Wednesdays and Fridays. The results are positive. Therefore, NS will implement this approach at more maintenance locations. Goal: further cost savings and a greater chance of a seat on busy days.
For small repairs, trains go to one of NSs service companies. NS has been planning this repair work differently since last year. Previously, NS performed these repair activities every day of the week. In the new approach, this is minimized on Tuesdays and Thursdays. Since working from home has become popular, these are the busiest travel days. NS wants to deploy as many trains as possible on these days. Repairs and restoration work that can wait are scheduled on less busy workdays, such as Monday, Wednesday, or Friday, and on weekends. Each report is assessed to determine if a repair can wait. Minor defects, such as a tear in the upholstery or a broken travel information screen, can sometimes wait a day. Critical defects, such as an air conditioning failure on hot days, naturally take priority. By scheduling repairs this way, NS needs fewer reserve trains, resulting in savings without increasing crowding on trains. Positive result The results of this new approach are positive. Therefore, NS will further expand this method to more locations. NS expects to save costs without increasing crowding on trains. This is because NS needs fewer reserve trains to run the same timetable. This also affects the deployment of the ICMm trains, better known as Koplopers, which can be removed from the fleet more quickly. These trains will remain available as an emergency reserve for the time being.
Explained in video: no small repairs on busy commuter days
Trial with adjustments in planned train length This month, NS is also conducting a trial with the length of trains. We want to test whether a different train length can help reduce the number of unexpectedly busy trains caused by disruptions. The Dutch rail infrastructure is experiencing more disruptions. Additionally, there will be up to 30% more work in 2025 than a few years ago. Due to disruptions, the planned deployment of short and long trains is sometimes disrupted. As a result, passengers are faced with either overcrowded or empty trains. NS will have trains run more often in a fixed composition. In this trial, NS will slightly shorten long trains, for example from 10 to 8 carriages, and lengthen short trains, for example from 6 to 8 carriages. This reduces the chance that a train is too short during disruptions. The trial will ultimately clarify whether this has the desired effect.
Explained in video: trial with different train length