Energy, Power and Electrical

Strengthen Implementation Electricity Tender

📄 Tender ID: 531051942 📅 Published: 01 Apr 2026

📋 Tender Overview

Prime Minister Pham Minh Chinh signed and issued Directive No. 10/CT-TTg dated March 30, 2026 on strengthening the implementation of electricity saving and developing rooftop solar power. Download Strengthen the implementation of electricity saving and develop rooftop solar power. The Directive clearly states: Ensuring safe, stable and continuous electricity supply for production, business and peoples lives is a key, urgent task, of decisive significance for economic growth and national energy security. 2026 is the first year of implementing the 5-year socio-economic development plan 2026 - 2030 with a double-digit growth target, placing huge requirements on ensuring electricity supply, especially developing domestic power sources and clean energy. Meanwhile, the international energy market continues to be complicated, with many potential risks, directly impacting national energy security. If there are not timely, synchronous, drastic and effective solutions, the risk of imbalance between electricity supply and demand may occur, especially in the period 2026-2028. Therefore, the synchronous and drastic implementation of solutions to manage demand and use electricity economically and effectively nationwide is important. especially important, contributing to reducing peak load, improving the efficiency of power system operation, and reducing pressure to invest in new power sources. At the same time, developing self-produced and self-consumed rooftop solar power combined with appropriate energy storage systems will supplement on-site power sources, enhance the flexibility of the power system, and contribute to ensuring national energy security. These solutions must be implemented drastically from 2026, associated with the specific responsibilities of each ministry, branch, locality, and enterprise. In 2026, strive to save at least 3% of total electricity consumption nationwide. To proactively implement solutions to manage electricity demand in 2026, the Prime Minister instructs ministries, branches, Peoples Committees (Peoples Committees) of centrally-run provinces/cities, corporations, and corporations. State companies, organizations and individuals urgently implement drastically, promptly and effectively the following tasks and solutions: 1. Objectives of managing electricity demand, using electricity economically and developing self-produced and self-consumed rooftop solar power: (1) Strive to save electricity at least 3.0% of total national electricity consumption in 2026; During peak hot months (April, May, June, July), save at least 10% of electricity consumption. (2) Synchronously deploy electricity demand management, load shifting and load regulation (DSM/DR) programs; Strive to reduce at least 3,000 MW of load capacity during peak hours of the power system when there is a risk of imbalance between supply and demand. (3) Promote the development of self-produced and self-consumed rooftop solar power, with priority given to installation at offices, production, business, service establishments and households; Encourage the installation of combined energy storage systems (BESS) to reduce peak load and increase the ability to be self-sufficient in on-site power sources. (4) Strive to have about 10% of public offices and 10% of households across the country install and use self-produced and self-consumed rooftop solar power every year; or strive for total development capacity to reach 20% of the installed capacity of RSP in the RSP development plan, period 2026 - 2030 of provinces/cities. Localities proactively develop and implement plans to develop rooftop solar power in accordance with actual conditions. (5) Maximize mobilization of on-site power sources and backup power sources of agencies, enterprises, production and business establishments when the power system is at risk of capacity shortage; Increase on-site energy use to reduce pressure on power supply from the national system. (6) Vietnam Electricity Group reduces power loss throughout the power system to less than 6%. Clearly define power saving targets, implementation roadmap, and responsibilities of each agency and unit2. Ministries, departments, branches, ministerial-level agencies, Government agencies, Peoples Committees of provinces and centrally-run cities, businesses, relevant organizations, households and individuals implement the following solutions:2.1. General requirements:(1) Urgently develop and promulgate a 2026 action plan on economical and efficient use of electricity, electricity demand management and rooftop solar power development; clearly define electricity saving goals and targets, implementation roadmap and responsibilities of each agency and unit; associate performance results with assessment of the level of task completion of the leader. (2) Organize and synchronously deploy solutions to reduce peak load, shift load, and adjust electrical load; proactively mobilize on-site power sources and backup power sources when the power system is at risk of capacity shortage; Increase on-site energy use to reduce pressure on electricity supply from the national system. (3) Promote propaganda and dissemination of legal regulations on economical and efficient use of energy, demand-side management, rooftop solar power development and appropriate energy storage solutions. (4) Strengthen inspection, supervision and evaluation of implementation results; promptly detectedInvestigate, rectify and strictly handle cases of violating regulations on electricity use causing waste; Periodically and irregularly report implementation results according to regulations. Implement electricity saving solutions at agencies, offices, manufacturing enterprises, and households 2.2. Specific requirements: a) Implement electricity saving at agencies and offices: (1) Strictly implement solutions to use electricity during peak hours; Issue an electricity saving implementation plan and quarterly electricity saving targets at offices. (2) Review,

🔍 Key Information

📄
Tender Reference No.
531051942
📅
Publication Date
01 Apr 2026
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 01 Apr 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…