Energy, Power and Electrical

State Government Passed Tender

📄 Tender ID: 524563406 📅 Published: 01 Nov 2025

📋 Tender Overview

This means that 52 hectares are available for green energy production in the Upper Styrian industrial region. This is an important step towards grid relief and decarbonization of industry.Graz (October 30, 2025).- At todays (October 30, 2025) meeting of the Styrian state government, regulations were passed for the designation of areas for the construction of open-space photovoltaic systems in Leoben and Kapfenberg. Achieving the (national) goal of a 100 percent domestic electricity supply from renewable energy sources by 2030 can be significantly supported by exploiting the energy generation potential of energy-intensive industrial companies. Due to the existing regional (grid) bottlenecks in the transmission network, generation plants in the vicinity of energy-intensive industrial companies, which can directly use the regionally generated electricity from solar energy, make an important contribution to increasing the share of electricity generation from renewable energy sources. This means that existing infrastructure (low network load) is also used efficiently. Furthermore, securing space and locations for the expansion of renewable energy generation plants supports the transformation of the energy system in the industrial sector and thus increases regional economic competitiveness and location attractiveness. Ground-mounted PV systems can now be built on land owned by Voestalpine Stahl Donawitz GmbH in Leoben-Donawitz (Sandhalde landfill) and at Voestalpine Bohler Edelstahl GmbH & Co KG Kapfenberg (Emberg landfill). This means that the electricity generated can be used at both locations, making an important contribution to the decarbonization of the steel industry. The selection of locations does not result in any impairment of settlement areas. The documents were examined in coordination with the relevant specialist departments, with the focus being on nature conservation assessments. In addition, a strategic environmental assessment (SEA) with an environmental report was carried out. Only positive comments were received in the publication process. This means that large amounts of electricity can be produced on site and used directly for industrial processes without putting a strain on the general power grid. The total output of the planned PV systems is around 57 megawatts (MWp) on a collector area of around 52 hectares. Sandhalde landfill location in Leoben: In Leoben-Donawitz, PV systems are to be installed on two sub-areas with a total area of 31.1 hectares. During the site planning, in addition to the technical parameters, extensive ecological studies were carried out, the results of which were incorporated into the site regulations. The visibility of the systems was also checked and taken into account in the location delineation. Emberg landfill location in Kapfenberg: In Kapfenberg, PV systems are being installed in the area of the Emberg landfill on an area totaling 21 hectares. The Emberg site is located in a basin and is only slightly noticeable from the surrounding area. With the special energy locations, we are providing an important impetus for the sustainable development of our business location and Styrian industry. The aim is to produce renewable energy where it is directly needed - directly at the large industrial companies. This means that companies can use their electricity directly for production processes, which strengthens the competitiveness of our Styrian companies. One thing is clear: we need attractive and stable framework conditions for our business location. Because only a strong business location means jobs, prosperity and security for Styrians Styrian, said Deputy Governor Manuela Khom. Generating large amounts of energy where they can be used immediately in the interests of short distances is a significant contribution to supporting the industry, especially in tense times. The regulation meets this request. The numerous positive feedback as part of the circulation process make it clear that Styria is taking an important and innovative step here. The Styrian industry with its over 120,000 employees is an essential pillar in the area of value creation - this must also be strengthened for the future, said State Councilor Stefan Hermann. According to the statement of the Industrial Association (IV) of Styria, systematic development of pre-contaminated areas, standardized decision-making bases, better data availability and coordinated strategies are cited as central levers to accelerate the expansion of renewable energies and support industrial decarbonization. Graz, October 30, 2025

🔍 Key Information

📄
Tender Reference No.
524563406
📅
Publication Date
01 Nov 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Austria

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 01 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Austria
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…