📋 Tender Overview
21.05.2025 AHM - a specialist in track exchange works between Warsaw and Katowicedla providing punctual travels by rail from Warsaw through Czestochowa to Katowice without speed limits - on the tracks between Piotrkow Trybunalski and Babami, a specialized, almost kilometer long, AHM sub -combine harvester. At the same time, a crushed stone cleaner and a concentrate work. Renovation and maintenance works for PLN 12.5 million are carried out from budget funds. On the Piotrkow Trybunalski trail-Baby specialized equipment will allow you to maintain smooth, reliable journeys on an important line No. 1 Warsaw-Katowice, which connects 3 voivodships: Masovian, Lodz and Slaskie. The effect of the work will be an increase in safety level and ensuring trains without interference at a speed of 120 km/h - otherwise in the coming years we would have to introduce restrictions that would extend the travel time on this route. In addition, the renovation of the Podstraza will enable in the future to increase the speed of warehouses to 160 km/h. In the part of the works, the greasy, adjusted track and the replaced layer will be supplemented. The workmanship has been conducted since April. In May, a special AHM800 track machine joined it, which carries out a comprehensive replacement of the subtraist without the need for the track. The use of especially the AHM 800R support combine - one of the longest railway machines, which in full composition has up to 800 m - significantly reduces the time of works. The vehicle lifts the track and performs the necessary work under it. The machine chooses the old crushed and the upper layer of the sub -podraza and provides new material in its place. - The use of high -performance machines limits the time of work and trains return to the track faster. This is particularly important on sensitive railway routes, on which a large number of trains run, as on line 1, connecting the two largest agglomerations in the country: Warsaw and Gornoslaska - said Adam Adamski, director of the Railway Line Plant in Lodz, PKP Polskie Linie Kolejowe S.A. based on earlier research, in some places there is a point replacement of rails and foundations. The track adjustment will be carried out. In addition, 5 engineering facilities (viaducts, culverts) will be repaired. Drivers will benefit from the work, as the surface is planned at two rail-road crossings at Tor No. 2 in Wola Moszczenicka and Jarostach. Travel plates will be listed, new asphalt and dehydration made. Due to the work in the area of rail and road crossings, there may be a short-term exclusion of signaling devices. We appeal to drivers to pay attention to the information boards, each time they are particularly careful and follow the safety rules, i.e. they paid close attention to whether the train is not coming. The value of currently carried out works, from budget funds, is about PLN 12.5 million net. The basic works will be carried out by the end of June. Train movement between Babami and Piotrkow Trybunalski takes place after one track, which was included in the timetables. The completion of these works will be the replacement of individual switches at Baby, Piotrkow Trybunalski and Rozprza stations, scheduled for the third quarter of 2025. In recent years, PLK has conducted: modernization of the Wolborka stop, repairing 5 rail and road crossings: in Skierniewice, Makow, Rokicinach, Piotrkow Trybunalski and Gorzkowice and renovation of additional tracks at the Piotrkow Trybunalski and Gorzkowice main tracks. The total cost of these works carried out in 2022-2024 amounted to approx. PLN 7.4 million.