📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma has formalized for 10.2 million euros VAT included the works contract New connecting branches of the M-14 and M-21 with internal service road of the M-40 and elimination of existing braiding. Section Link M-40M-14M-21 in the vicinity of the Cvitas Metropolitano stadium in Madrid. The corresponding announcement will soon be published in the Official State Gazette BOE.The planned section of action is located between kilometers 9 and 10 of the M-40 at the height of the connection node of the latter with the M-14 M-21 and A-2. The construction of two new branches has been planned along with 2 elevated structures on the M-40 that would connect the M-14 and M-21 with the service road that runs along the inner margin of said ring road.Specifically the new branch from the M-14 would cross over the carriageways of the M-40 until it connects with its internal service road southbound running along about 295 m.The second branch coming from the M-21 with the same destination as the previous one and a length of about 565 m would run elevated on both roads of the M-40 and on the current structure of the M-14.Likewise the current contact of the branch from the M-14 airport with the trunk road of the M-21 direction San Fernando and Coslada has been planned to move eastwards in order to resolve the existing braiding section on the M-21 at the height of its junction with the M-14 as it is insufficient. To this end a new road has been planned about 1215 m long which would run significantly parallel to the M-21 with crossings at different levels until connecting again about 500 m more in front of where it currently does. The route of this new road rests on a new structure and passes over the existing structure on the M-21 for which a retaining wall of the lands of the current abutment is designed.The project is a relevant action in order to improve mobility in the connections of all these roads that are of state competence.