📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma has formalized for 6.5 million euros VAT included the works contract to improve the protection of vulnerable users in the crossing of Cabezuela del Valle Cceres with the construction of a new bridge over the Jerte River and the extension of the national N-110 to facilitate access.This is a necessary action to improve road safety and the functionality of this section of the N-110 road as well as the mobility and accessibility of other users of the infrastructure. Not surprisingly the future infrastructure will have a mixed use allowing the passage of vehicles and pedestrians. The corresponding announcement will soon be published in the Official State Gazette BOE.The intervention is included in the Recovery Transformation and Resilience Plan PRTR which includes investing up to 357 million euros excluding VAT from NextGenerationEU funds to modernize tunnels and enhance the protection of fauna and vulnerable users in the State Road Network.Purpose of the actionIn the town of Cabezuela del Valle the N-110 currently has a bridge over the Jerte River that due to its age and dimensions only allows the transit of vehicles with alternative direction regulated by traffic lights. The solution of the problem of this narrowing and its negative consequences on the level of service and traffic safety is the fundamental objective of the project.Along with the construction of a new bridge over the river Jerte a section of new road of 400 m in length is projected in variant by the right bank of the river to link with the existing route as well as a new roundabout that connects with the new structure. All this is soughtImprovement of mobility and pedestrian and cyclist accessibility sidewalks are projected on the new bridge with pedestrian accesses on both banks of the Jerte River. In particular on the right bank of the river the river promenade is replenished and conditioned including a ramp connecting with the sidewalks of the new bridge for pedestrians and cyclists as well as people with reduced mobility. In addition the current bridge has an eminently pedestrian use.Improvement of road safety and vulnerable users by reducing the traffic of the current crossing section on which heavy traffic will also be eliminated. Likewise the insecurity associated with the alternative traffic that currently supports the existing bridge will be eliminated.Rearrangement of bus stops contemplating their connection with the projected sidewalks.In addition the transfer of the section that will result as a crossing after the commissioning of the new bridge and the new route of the N-110 to the City Council of Cabezuela del Valle is contemplated.With this action once the N-110 road has been equipped with the new bridge and road with the appropriate geometric characteristics and together with the conditioning of this road between Navaconcejo and Tornavacas completed in May 2020 the Ministry completes the improvement of this road that constitutes the main communication route of the Jerte River Valley This will contribute to the increase of road safety and road capacity as well as driving comfort.SpecificationsThe main purpose of the project is the new bridge over the river Jerte which has the following fundamental characteristicsIn plan its layout is straight approximately 65.2 meters m long connecting at its northern end with the projected roundabout and at its southern end with Avenida de Plasencia in the urban center of Cabezuela del Valle.The cross section has variable width between 13.80 and 16.60 m and consists of two lanes of 3.50 m two shoulders of 1.00 m barriers of 1.00 m and sidewalks of variable width between 1.80 and 3.20 m in which viewpoints to the river Jerte are foreseen.In addition to the above the projected bridge has a unique character due to its integration into an environment of high ecological and landscape value so that the solution adopted presents a high aesthetic quality so that the work is properly integrated into the landscape. Consequently this solution is based on a minimalist design looking for an aesthetic inspired by the existing arch bridge upstream both in the curved shape of the lower face of the board and in the geometry and texture of the abutments and stone walls.On the other hand the new bridge avoids any affection to the bed of the river Jerte from the environmental and hydrological point of view so in no case is the current state of the channel modified.