📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma has definitively approved the layout project and the public information file Conditioning of the N-260 Road Pyrenean Axis. km 449600 to 463600. Section Balupor Tunnel Fiscal in the province of Huesca. This milestone is a fundamental step to continue with the drafting of the construction project.The estimated budget for the actions on this road whose main section has a length of 12.85 kilometers amounts to 98.79 million euros VAT included.The layout project includes the construction of a 1790-metre-long tunnel known as the Jnovas Tunnel as well as two viaducts the Barranco de las Guargas Viaduct 235.50 metres long and the Barranco de Santiago Viaduct 175.00 metres long. In addition the construction of six bridges four concrete walls and five breakwater walls is contemplated.As for the road configuration lanes of 3.50 meters wide one lane in each direction and shoulders of 1.00 meters will be established. Likewise the implementation of four split roundabout-type intersections and the creation of roads parallel to the road to restore access to the adjacent farms are planned.