📋 Tender Overview
The Ministry of Transport, Mobility and Urban Agenda (Mitma) has approved the public information file and definitively the urban integration layout project of the State Road Network in Teruel for the sustainable improvement of mobility, as published today in the Official State Gazette (BOE). In this way, the drafting of the construction project is now continuing, incorporating the result of the allegations presented in the public information procedure.
The estimated budget of the actions amounts to 6.4 million euros (VAT included), which will be financed from European funds, within the program to improve roads in urban environments of the Recovery, Transformation and Resilience Plan, endowed with 105 million euros (excluding VAT).
This project includes the humanization of the N-223 road (Avenida de Sagunto) and actions in the field of lighting in three links.
The humanization of the crossing implies its subsequent transfer to the City Council of Teruel, as it lacks a service function to long-distance traffic and has an eminently local character, with the City Council becoming the new responsible for its conservation and maintenance as the owner of the road. The transfer of this section will not undermine the continuity of the state road network or its functionality as there are better alternatives for long-distance traffic.
Characteristics of the works
Some aspects of the main actions that the construction project will contemplate are the following:
Humanization of the N-223 road: reduction of the width of the lanes for widening sidewalks and construction of bike lanes; reinforcement of signage at crossings between the cycle lane and the lane of the road; provision of 2+1 lanes in some sections; redistribution of bus stops, loading areas and parking; adaptation of sidewalks with trees and furniture; accessible and safe pedestrian routes; improvement of intersections and roundabouts to channel traffic; spread of a layer of sound-absorbing pavement; Improved surface drainage.Renovation of the lighting in the Avenida de Sagunto and in three links of the surroundings of the city: link Center of Teruel of the A-23 motorway, link of Villaspesa in the N-234 and the surroundings of the access to the business park of La Paz, road of San Blas, the National Parador, the northern variant of Teruel N-234 and the access branch to the A-23.
The action is aligned with the State Strategy for Energy Efficiency of the State Road Network and the State Strategy for the use of bicycles.