📋 Tender Overview
The Ministry of Transport, Mobility and Urban Agenda (Mitma) has tendered a contract, amounting to 17.9 million euros (VAT included), for the execution of various maintenance and operation operations on State roads in Asturias, as announced today in the Official State Gazette (BOE).
The contract affects a total of 178.292 km, which includes 85.9 km of highways, and has a duration of three years, with the possibility of extension for another two years, plus an additional extension of nine months.
It is part of the Mitma road conservation and operation program, which allows the maintenance of roads in the State Road Network so that it is accessible in adequate conditions for all citizens.
The indicated sector is the 4, which includes the following roads:
Road A-8:Km 420,000 – km 505,945Road N-632, several sections:Km 114,000 – 124,800Km 144,829 – 149,082Road N-632A, several sections:Km 124,800 – 131,000Km 135,050 – 156,090Km 159,187 – 161,322Road N-634, several sections:Km 507,320 – 517,292Km 524,895 – 548,470Road N-640:Km 0,000 – 13,300Road N-640A:Km 0,000 – 1,072
In addition, this contract incorporates two specific projects of small works necessary to improve the functionality of the road:
Action of replacement and improvement of containment systems on the N-632A road between Valdredo, km 135,050, and Villademoros, km 156,090.Project of surface rehabilitation of the firm in the A-8 motorway in the section of the Navia variant between km 477,600 and 483,600.
Characteristics of the conservation model
The model of mixed contracts (services and works) for the execution of conservation and operation operations aims to offer a comprehensive mobility service to the user, improve the state of the road and network, and optimize public resources.
Through them, works are carried out to help the roads and ordinary maintenance of the roads, to allow the infrastructure and its functional elements to have the best possible traffic and safety conditions. It includes actions such as: status and programming information agenda, operating aid and road safety studies, and maintenance of road elements with adequate quality levels.
Likewise, within the framework of the strategy to reduce emissions and improve energy efficiency, a series of novelties have been introduced in the specifications of these contracts:
Last year, energy efficiency measures were incorporated in service facilities such as self-consumption, renewable heating systems, energy saving measures in lighting or the implementation of electric motor vehicles.In contracts tendered from 2023 onwards, criteria relating to the mitigation and compensation of the carbon footprint shall be included. Thus, companies may include as a scoring improvement in their offers the presentation of a decarbonization plan with the purpose of achieving the neutral carbon balance 5 years after the start of the contract. The compensation can be made through the absorption projects registered in the carbon footprint registry, compensation and carbon dioxide absorption projects under the Ministry for the Ecological Transition and the Demographic Challenge or through other options.
With this, the aim is to reduce the 71,640 tons of CO2 per year generated by the ordinary operation and maintenance and operation of the State Road Network and reinforces the orientation towards the Sustainable Development Goals (SDGs) to which Mitma is committed.